Korea's power market is being restructured.
Where this is going
For decades Korea's power system was run from a small number of large plants under central dispatch. Renewables, battery storage and aggregated small resources now take a growing share of that work, and the market is being restructured around them: a day-ahead and real-time market piloted on Jeju, capacity contracts for storage, rules for virtual power plants, and a distributed-energy act that permits local power sales in designated zones.
For storage and VPP investors and operators this creates new revenue opportunities. It is also difficult to assess from outside Korea: the rules are published in Korean, market data sits inside the exchange's systems, and grid conditions determine what an asset can earn. kdermap provides the data, analysis and tools to evaluate, build and operate storage and VPP assets in Korea without a local team.
Seven products, one standard: every figure is traceable to its source.
Available now
Korea storage and VPP market analysis
News and analysis on Korea's power market for battery storage and virtual power plant investors and operators: what changed, what it means, and the source.
Korea power market data terminal
The data behind VPP and ESS projects in Korea's electricity market — live grid conditions, battery revenue benchmarks and market statistics, built from KPX data with methods published.
In development
ESS Project Feasibility Study
Revenue forecast, levelized cost of storage, IRR, NPV, payback and debt capacity for standalone ESS projects in Korea, with all assumptions disclosed.
Distributed Resource Aggregation and ESS Siting
Existing solar and storage mapped to their distribution feeders, showing where resources can be aggregated efficiently and where grid headroom supports new ESS.
ESS Trading & Optimization
Day-ahead and real-time bidding and 15-minute dispatch scheduling for ESS in Korea, with daily performance reported against a perfect-foresight benchmark.
Settlement Verification and Revenue Simulation
Korean settlement rules implemented in full for VPPs and individual resources: verify every payment against the KPX statement and model revenue under different bidding and allocation strategies.